The reaction to the video posted on the channel Namanganliklar.uz, where it is reported that the 2nd building of NamECI is disconnected from electricity.
The telegram channel Namanganliklar.uz has published a video stating that there has been no electricity in the 2nd building of the Namangan Engineering and Construction Institute for two days.
Indeed, on November 3 this year, the 2nd building of the institute was disconnected from the emergency power supply. In connection with the current situation, they immediately contacted the officials of the Istikbol power grid company, which provides services to the institute. As a result of the inspection carried out by the employees of the enterprise, it was found that the cable network "Institute-1" 6 kV, departing from the station 110/6 kV "Shimoliy", located on the territory of the New Namangan region, was damaged.
At present, the Istikbol Electric Grid Company is taking measures to eliminate this problem and to attract special equipment for this purpose.